抢庄三张

News Information

抢庄三张 content

COMPANY NEWS

(1) Whether the design complies with relevant national technical policies and standard specifications

Degree regulations. (2) Whether the drawings and documents are complete and whether they can meet the construction requirements. (3) Whether the design is reasonable or not

Missing. Check for errors in the drawings. Whether the pipeline number and equipment model are complete. Relevant department

Whether the elevation, slope and coordinate position of the bit are correct. Whether the material name, specifications and quantity are correct and complete.


Phone: + 86-755-83786658

a